FEA Of Column For GASCO

Gasco required to study an existing column built in 1978, which was heavily corroded and some places replaced with new sheet metal. The goal was to verify the integrity of the renovated column with the various working conditions and loads, internal pressure, packing load, nozzle load, platform load, pipe support, insulation, operating liquid and self-weight. Find our engineering solution that was done by Fluid Codes team.

    ×

    Thank you for your message. It has been sent.
    Please Check Your Email